• Call-for-Entries-V-2.JPG.png
  • 2027 Engineering Excellence Awards

    Categories

  • East---1.png
  • East---2.png
  • CATEGORIES

    In order to more closely mirror the ACEC Engineering Excellence
    Awards competition, submissions in the ACEC Utah Award
    program are entered into one of 12 categories [A-L] listed below.

  • Category A | Studies, Research & Consulting

    Non-design services, projects not involving the preparation of construction documents consisting of but not limited to the following types of projects:

    •  New products, materials, & technologies
    •  Expert testimony
    •  Basic research & studies
    • Computer/software technology
    •  Technical papers
    •  Public outreach/involvement
    •  Water conservation
    •  Security plans
    •  Project feasibility studies/economic/risk
    •  Value engineering

    Category B | Building/Technology Systems

    • Mechanical/electrical/plumbing
    • Computer/technology
    • Communications
    • Acoustics
    • Software systems
    • Sustainability or carbon neutrality
    • Efficiency certification standards, e.g. LEED®
    • Energy efficiency - new & retrofit
    • Secure facilities (military research/correctional

    Category C | Structural Systems

    • Foundations
    • Tunnels
    • Buildings
    • Seismic design
    • Towers
    • Bridges
    • Stadiums

    Category D | Surveying & Mapping Technology

    • Geometrics, ALTA, land title & rights surveys
    • Control, GPS, monitoring, or construction surveying
    • Survey mapping, GIS/LIS, photogrammetry

    Category E | Environmental

    • Hazardous waste
    • Solid waste
    • Restoration/reclamation remediation
    •  Air quality
    • Noise
    • Recycling
    • Waste pond management
    • Carbon Sequestration & Trading
    •  Mitigation

    Category F | Waste & Storm Water

    • Wastewater collection treatment and disposal
    • Residuals management & reuse
    • Graywater systems
    • CSOs
    • Mine tailings
    • Agricultural
    • Storm water management
    • Erosion control

    Category G | Water Resources

    • Hydraulics, hydrology
    • Surface and groundwater supply development
    • Treatment
    • Watershed management
    • Transmission, distribution & storage
    • Water use reduction
    • Flood risk management
    • Climate adaptation
    • Coastal & eco-system restoration
    • Locks/dams/water control structures
    • Irrigation

    Category H | Transportation

    • Highways
    • Railroads
    •  Airports
    • Marine/ports
    • Public transit
    • Intermodal facilities

    Category I | Special Projects

    • Safety & security
    • Corrosion protection/cathodic protection
    • Land development
    • Program & construction management
    • Trenchless technologies/directional boring
    • Recreational facilities
    • Subsurface engineering

    Category J | Small Projects

    Total project construction budget does not exceed $2.5 million. At the entrant’s discretion, except for entries in Category A, projects under $2.5 million are not limited to this category.

    Category K | Energy

    • Transmission & distribution
    • Power generation
    • Renewable energy
    • Cogeneration
    • Energy storage technologies
    • Energy usage reduction programs
    • Demand side management

    Category L | Industrial & Manufacturing Processes/Facilities

    • Petrochemical
    • Biotech
    • Manufacturing
    • Heavy industry
    • Industrial waste
    • Materials handling
    •  Mining, metallurgy, mineralogy